Scope Change Control System Development Checklist and Worksheet

پايگاه دانش مدیریت پروژه> الگوهای مديريت پروژه> گروه فرايندی کنترل> کنترل تغيير محدوده 

Scope Change Control

Definition: A scope change control defines the procedures by which the project scope may be changed. It includes the paperwork, tracking systems, and approval levels necessary for authorizing changes. The scope change control should be integrated with the integrated change control and, in particular, with any system or systems in place to control product scope. When the project is done under contract, the scope change control must also comply with all relevant contractual provisions.

Acceptance Level:  Generally accepted

Alternative or Related Terms: None

Application Areas/Intended Uses: Scope change control is a tool or technique supporting and resulting in appropriate changes to the scope of a project.

Chief Advantages: Scope change control helps to manage the process of deciding on, implementing, and documenting changes to project scope.

Additional Reading:
Controlling Scope Creep. Adrian Abramovici. PM Network, January 2000, 44-45, 47-48.